‘Work Underway To Fix Failed Welds In Horse Tram Tracks’
‘Red concrete being dug up after defect discovered’ “Work is underway to fix two failed welds in the horse tram tracks on Douglas promenade. The contractor is having to dig up the red concrete in the Strathallan area after a dip in the rail track was discovered. As a result, a section of rail on ei…